KFPSQS206-Issue-1-Quality-Schedule-for-the-application-of-BS-EN-ISO-9001-2015-to-Kitchen-Fire-Protection-System-Gold-Approval-Nov-2018-rev.-Nov-2021

The document “KFPSQS206 – Quality Schedule for the application of BS EN ISO 9001:2015 to Kitchen Fire Protection Systems Gold Approval” outlines the standards and requirements for organizations seeking Gold Approval under the NSI Kitchen Fire Protection Systems scheme. It emphasizes compliance with BS EN ISO 9001:2015 for Quality Management Systems and the BAFE SP206 for product certification, detailing the necessary processes for design, installation, commissioning, and maintenance of kitchen fire protection systems. The schedule serves as a framework for auditing and ensuring that organizations meet industry standards for quality and safety in fire protection services.

Read More

Tech-Bulletin-0013-PD-6662-2010

NSI Technical Bulletin No. 0013 provides guidance on the implementation of PD 6662: 2010, which outlines the application of European standards for intrusion and hold-up alarm systems. Key changes include the transition period allowing installation under the previous PD until May 31, 2012, and the requirement for all systems to comply with the new PD from June 1, 2012. The bulletin details the new standards called up by the PD, including BS EN 50131 series and BS 8243: 2010, which must be adhered to for compliance and maintaining NSI approvals. Manual review is recommended for complete details on specific requirements and standards.

Read More

NSI-Technical-Bulletin-No-0063-Publication-of-BS-8484_2022

The document is a Technical Bulletin (No. 0063) from the National Security Inspectorate, detailing the publication of BS 8484:2022, which provides a code of practice for lone worker services. This new standard, published on March 31, 2022, supersedes BS 8484:2016 and introduces changes such as the categorization of all activations as alarm activations and the requirement for monitoring centers to conform to specific standards. Implementation of the new code will begin on March 31, 2023, with non-conformance issues being noted during the transition period.

Read More