IMPLEMENTATION OF BS 7858:2019 SCREENING OF INDIVIDUALS WORKING IN A SECURE ENVIRONMENT – CODE OF PRACTICE

This circular letter introduces the new edition of BS 7858, which will be mandatory from April 1, 2020. It outlines significant changes to the standard, including a shift towards risk assessment and the removal of character references. The letter also provides information on where to access the standard and encourages recipients to reach out with any questions.

Read More

ISSUING CERTIFICATES OF COMPLIANCE

This circular letter serves to remind approved companies of the requirement to issue Certificates of Compliance for newly installed, upgraded, and taken over systems. It emphasizes the importance of confirming that installations comply with applicable standards and provides guidance for various scenarios.

Read More

NON-BAFE FIRE RISK ASSESSMENT SCHEME

This circular informs approved companies and applicants about the withdrawal of the Warringtonfire Fire Risk Assessors Certification Scheme (FRACS) and the introduction of the NSI Fire Risk Assessment Scheme (FRAS) effective from 1st January 2025. The NSI FRAS will be a closed scheme available only to those already registered on the FRACS.

Read More

BS 9263:2016 – COMMISSIONING, MAINTENANCE AND REMOTE SUPPORT

The British Standards Institution has published BS 9263:2016, which outlines the commissioning, maintenance, and remote support for intruder and hold-up alarm systems. While the changes from the previous standard DD 263:2010 are minor, a new informative annex regarding standby battery capacity has been introduced. Stakeholders are encouraged to familiarize themselves with BS 9263 before the new edition of PD 6662 is published, likely in 2017.

Read More

INTRODUCTION OF NSI CODE OF PRACTICE NCP 104 ISSUE 3

This circular announces the introduction of the third edition of NSI Code of Practice NCP 104 for CCTV systems, updating requirements to align with new standards. It outlines the benefits of the new code and the timeline for compliance, emphasizing the importance of user requirements and system validation.

Read More

INFORMATION RELATING TO APPROVED COMPANY PREPARATIONS FOR THE IMPACT OF THE NATIONAL PUBLIC SWITCHED TELEPHONE NETWORK (PSTN) TO ALL IP COMMUNICATIONS NETWORK MIGRATION

This Circular Letter introduces NSI Technical Bulletin No. 0061, which outlines the expected performance and preparations required for the migration from PSTN to ALL IP communications. It includes background information, a timeline for rollout, and mandatory actions for approved companies.

Read More

NSI Quality Schedule ELSQS 122 – BS EN ISO 9001:2015

This circular letter informs NSI Fire Gold approved companies and applicants about the issuance of NSI Quality Schedule ELSQS 122 (Issue 4) for BS EN ISO 9001:2015. It provides guidance on obtaining the new schedule and outlines its application alongside existing requirements.

Read More